NEC electrical plan for a house: what the 2023 code asks for
Most building departments ask for an electrical plan with a permit application for new construction or a major remodel. The National Electrical Code (NFPA 70) does not dictate how that drawing looks, but it decides what the installation must contain. A good plan shows those requirements before the walls are closed, when they are still cheap to get right.
See how the floor plan, circuits and permit documents fit together.
Work through a house example rather than copying a circuit count.
Check the adopted code and keep unresolved items visible.
Which NEC edition applies to your project?
The NEC is revised every three years, and each state, county or city adopts an edition on its own schedule, sometimes with local amendments. Adoption differs across jurisdictions, so a newer national edition does not automatically apply to your address.
The edition that matters is the one enforced by your Authority Having Jurisdiction (AHJ), usually the local building department. Check it before you design: rules such as where GFCI protection is required have changed noticeably between editions.
Read the room use and furniture first, then place devices. Only selected devices are shown: this teaching layout is not a complete plan or a receptacle-spacing check.
Open full-size diagram ↗The branch circuits every dwelling needs
Section 210.11 sets the minimum circuits. General lighting and general-purpose receptacles are sized from the floor area: the code counts 3 volt-amperes per square foot, so a house needs enough 15 A or 20 A general-purpose circuits to carry that load, spread evenly.
On top of those, four kinds of 20 A circuits are required and must stay separate from the rest of the house:
- At least two small-appliance circuits for the receptacles in the kitchen, pantry, breakfast room and dining room (210.11(C)(1)).
- At least one laundry circuit, for the laundry receptacles only (210.11(C)(2)).
- At least one bathroom circuit: either the receptacles of all bathrooms, or everything in a single bathroom (210.11(C)(3)).
- At least one garage circuit in an attached garage, or a detached garage with power (210.11(C)(4)).
Where receptacles are required
Section 210.52 lists the receptacle outlets of a dwelling. Several rules are spacing rules — no point along a wall more than 6 ft from a receptacle, a receptacle for every wall countertop space 12 in or wider — and they can only be checked on a dimensioned drawing.
Others are simply presence rules, and they are the easiest to miss on a plan: at least one receptacle in each bathroom, the laundry area, each vehicle bay of the garage, each unfinished part of a basement, and qualifying wall space in a foyer larger than 60 sq ft; one outdoor receptacle at the front and one at the back of a one-family house; one on each balcony, deck or porch reachable from inside.
- Habitable rooms: receptacles along the walls (6 ft / 12 ft rule).
- Kitchen countertops: served by at least two small-appliance circuits.
- Bathrooms and laundry: required receptacles; garages: a receptacle in each vehicle bay; unfinished basement areas: required receptacles.
- Outdoors: front and back for a house, plus each balcony, deck or porch.
- HVAC equipment: a service receptacle nearby (210.63).
Switched lighting outlets
Section 210.70 requires a wall-switch-controlled lighting outlet in every habitable room, kitchen and bathroom, in hallways and stairways, in the garage, and at outdoor entrances. In habitable rooms other than kitchens and bathrooms, a switched receptacle can stand in for the lighting outlet — the familiar switched half of a duplex receptacle in a bedroom.
Storage and equipment spaces such as attics, crawl spaces and basements need a lighting outlet when they are used for storage or contain equipment that will need servicing.
GFCI and AFCI protection
Ground-fault (GFCI) protection is required for receptacles in bathrooms, kitchens, laundry areas, garages, outdoors, basements and crawl spaces, and for specific appliances such as dishwashers and, since 2023, ranges and dryers. Arc-fault (AFCI) protection is required on 120 V, 10 A, 15 A and 20 A branch circuits supplying most living spaces: kitchens, bedrooms, living and family rooms, hallways, closets and laundry areas.
Where both apply, a dual function breaker covers the circuit. Our guide to GFCI and AFCI requirements goes room by room.
Preparing the plan in Planelico
Import the architect’s floor plan as a PDF, draw each room, pick its type and enter its square footage. Place receptacles, switches, lighting outlets, data and appliances. Planelico then proposes general-purpose, small-appliance, laundry, bathroom and garage circuits, sizes the 240 V appliance circuits in AWG, and assigns each breaker its GFCI, AFCI or dual function protection.
It also flags rooms where the NEC expects a receptacle or a switched lighting outlet. It does not measure the 6 ft or 12 in spacing rules: automatic spacing validation is not implemented, so wall spacing stays with the designer and the inspector, even when the drawing is calibrated.
What belongs in an electrical permit package?
A floor plan answers where devices go. A circuit schedule answers what supplies them. A service load calculation answers whether the supply can carry the proposed loads. These are different documents, and a building department may request all three, together with a riser or service diagram and equipment specifications.
Before drawing, ask the permit office for its residential submission checklist. Confirm the drawing size, required scale, identification of existing versus new work, and whether a licensed designer or contractor must sign the documents. Planelico exports the layout and panel design pack; it does not produce a complete service calculation or guarantee permit acceptance.
- Identify the project address, floor, drawing revision and scope of work.
- Show room uses, receptacles, switched lighting, fixed appliances and outdoor equipment.
- Include a symbol legend and circuit descriptions that match the plan.
- Have the electrician supply any required service, grounding, bonding and load-calculation details.
The floor plan locates devices; the panel pack documents proposed circuits; the estimate prices an agreed scope. A service load calculation remains a separate task.
Open full-size diagram ↗| Document | Example information | Who completes the review |
|---|---|---|
| Floor plan | Rooms, device locations, legend and scope | Designer / electrician; AHJ format |
| Panel schedule | Circuit purpose, voltage, rating and protection | Electrician checks actual equipment |
| Service load calculation | Loads, applicable method and supply capacity | Qualified designer / electrician |
| Service or riser details | Service equipment, grounding and bonding as requested | Required separately when the AHJ asks |
Review the house room by room, then circuit by circuit
For a three-bedroom house, start with a walk through the plan: living spaces, kitchen and dining area, bathrooms, laundry, garage, then outdoors. Check the intended furniture layout before deciding where outlets and controls belong. A code minimum does not tell you where the desk, bedside lamps or vacuum charger will be used.
Then trace each circuit across those rooms. A kitchen small-appliance circuit can serve eligible dining-area receptacles, but kitchen lighting cannot simply join it. A bedroom circuit may combine lighting and general-purpose receptacles. Following both the room view and the circuit view catches mistakes that device counts alone miss.
Typical NEC 2023 examples for the circuits described. Review every location and appliance supplied, the adopted code and any amendments; these four examples are not an exhaustive protection chart.
Open full-size diagram ↗The final review before you submit
Compare the floor plan, appliance list and panel directory after every major revision. A kitchen redesign can move the island, change the range rating and add a built-in microwave; the original circuit proposal may no longer describe the work.
Treat presence warnings as prompts to inspect the drawing, not proof that spacing or installation details comply. Planelico does not automatically verify receptacle spacing, conductor routing, box fill, service capacity or local amendments. Its NEC 2023 profile is a planning baseline even when the project jurisdiction enforces another edition.
Case study: assemble a new-house submission
Use a hypothetical three-bedroom house with a kitchen and dining area, two bathrooms, laundry, an attached garage and an outdoor patio. The first drawing pass locates devices and names rooms. The second pass identifies actual equipment: electric or gas cooking, dryer type, water heating and any proposed EV charging. Record unknown models as open decisions instead of filling in convenient ratings.
In the circuit review, trace the kitchen and dining receptacles into eligible small-appliance circuits, then review bathroom, laundry and garage supply. General-purpose groups follow the room areas and loads. Add the selected appliance circuits only after checking their actual requirements. The illustrated directory is deliberately an excerpt; it is not a fixed circuit count for this house.
The handover then includes the floor plan, the saved panel proposal and a list of unresolved items. Ask the electrician for the service load calculation and any service drawing requested by the permit office. If the selected range or EV charging current changes, revise the equipment information and the affected documents together.
Case study: a kitchen remodel is not a whole-house redesign
For a remodel, mark the existing kitchen, its known circuits and the work boundary. Keep unchanged rooms visible for orientation, but explain which devices are outside the work scope. A retained outlet with an unknown supply should carry a verification note. Do not assign it to a new circuit only to make the drawing look complete.
Then show the proposed cabinets, countertop outlets, lighting and appliances. Ask the AHJ how the adopted alteration requirements apply, and have the electrician assess what can remain. Your deliverable should communicate the proposed work and its interfaces with the existing installation, not imply that the imported drawing certifies concealed wiring.
Quick method with Planelico
- 1
Confirm the NEC edition
Ask your building department which edition and local amendments apply.
- 2
Import the floor plan
Add the PDF, one page per floor.
- 3
Qualify every room
Name it, pick its type and enter its area in square feet.
- 4
Place the devices
Receptacles, switches, lighting, appliances and outdoor outlets.
- 5
Generate the load center
Review the proposed circuits, breakers and points to check.
- 6
Export the PDF
Share the plan and the panel design pack with your electrician or the permit office.
Frequently asked questions
Official sources
Related guides
Build your electrical plan online
Import your PDF plan, drop the electrical symbols and export a clean document to share.