How to make a house electrical plan
An electrical plan answers one question for everyone involved: what goes where. Done before framing inspections, it turns vague wishes into a document your electrician can price and your inspector can read.
Place devices around rooms, furniture and daily use.
Distinguish existing, new and unverified work.
Review a coordinated plan, schedule and quote request.
Start from the architectural floor plan
Work on the real floor plan, not a sketch: room sizes, door swings and cabinet runs decide where receptacles and switches can go. If your architect or builder gives you a PDF, you can annotate it directly instead of redrawing it.
Read the room use and furniture first, then place devices. Only selected devices are shown: this teaching layout is not a complete plan or a receptacle-spacing check.
Open full-size diagram ↗Name and qualify each room
Give each room its type — bedroom, bathroom, kitchen, laundry, garage — and its area in square feet. The type decides which NEC rules apply; the area sizes the general-purpose circuits.
Place the receptacles
Along the walls of habitable rooms, no point should be more than 6 ft from a receptacle. Add the ones you actually need: both sides of a bed, behind the TV, the desk, the vacuum. Then the required ones: bathroom, laundry, garage, outdoors front and back, balconies and decks.
Lighting and switches
Every habitable room, bathroom, hallway, stairway and the garage needs a wall-switch-controlled lighting outlet. Draw the switches at the doors you actually use, and add 3-way switches at both ends of stairs and long hallways.
Appliances and special loads
Place the range, dishwasher, refrigerator, microwave, washer and dryer, water heater, HVAC equipment and EV charger. Each fixed appliance usually gets its own circuit, and some — range, dryer, water heater, EV charger — need 240 V.
From devices to circuits
Group rooms onto general-purpose circuits, keep the required kitchen, laundry, bathroom and garage circuits separate, and choose the protection of each breaker. Planelico proposes this layout from your plan and exports a panel design pack with the directory and the circuit schedule.
Use furniture and daily routines to review the layout
Start at the front door and imagine using the house after dark. Can you turn on the hall light before walking across the room? Are there outlets at both bedside tables, behind the television and at the desk? Will the kitchen layout accommodate the appliances that are actually left on the counter?
Use a separate pass for vacuuming, holiday lighting, outdoor work and future uses such as a home office. These are comfort and planning choices. Keep them separate from the code review so that a convenient location does not accidentally replace a required receptacle elsewhere.
| Everyday use | Show on the drawing | Verify next |
|---|---|---|
| Desk on the north wall | Outlets and a separately identified data point | Furniture clearances and cord access |
| Reading lamp by the sofa | Convenient receptacle and intended switch control | Whether a switched receptacle is part of the lighting design |
| Ceiling light at the entrance | Lighting outlet and control relationship | Actual switching arrangement |
| Future printer or heater | Equipment note with expected load | Suitability of the proposed circuit |
| Existing outlet of unknown supply | Existing / verify label | Electrician identifies its circuit on site |
For a remodel, distinguish existing, removed and new work
Do not draw an existing house as if every device were new. Record which equipment is to remain, which is removed and which is added, using clear labels or layers explained in the legend. Verify existing circuit assignments on site before relying on them.
Identify uncertain information explicitly: “existing circuit to verify” is more useful than an invented breaker number. Have the electrician check the existing wiring and panel suitability before deciding what can be reused. The software does not diagnose concealed wiring from an imported plan.
Use a clear scope legend: E for existing, N for new and ? for information to verify. A proposed new point does not prove that the existing circuit can supply it.
Open full-size diagram ↗Hand over a coordinated set of documents
Export a readable floor plan with its legend, then the panel design pack if circuit generation is included in your plan. Keep the room names and equipment descriptions consistent between documents. Give the electrician a list of open decisions such as appliance models, charging rate or outdoor equipment.
For estimates, state whether the scope includes supply of fixtures, patching, permit fees, inspection and any service upgrade. For a permit, obtain the AHJ checklist first: a layout PDF and generated directory may be only part of the required submission.
- Check every floor, garage and outdoor area for omitted devices.
- Review switched lighting and special appliance connections.
- Check the circuit proposal after the final room and equipment edits.
- Mark the drawing revision and remove superseded exports from the handover set.
The floor plan locates devices; the panel pack documents proposed circuits; the estimate prices an agreed scope. A service load calculation remains a separate task.
Open full-size diagram ↗Worked example: convert a spare bedroom into a home office
Begin with the furniture: place two desks, a printer shelf and any sofa or reading chair on the reference layout. Mark usable receptacle locations around that arrangement, then identify the ceiling light and the controls needed at the entrance. Draw data points with separate labels so the power and communications scope remains clear.
On a renovation, distinguish outlets to remain from proposed new devices. In the before-and-after diagram, E denotes an existing point, N a new one and ? an unknown circuit assignment. These are scope labels, not circuit references. Ask the electrician to establish the existing supply before deciding whether it can serve the revised room.
Finally check the circuit proposal, room name and equipment notes. A printer or portable heater is a load consideration, not just another drawing icon. Include the final furniture layout and unresolved equipment choices in the handover so the installer and homeowner are reviewing the same intended use.
Inspect the PDF as the person receiving it
Open the exported PDF at the size it will be printed. Check that symbols do not disappear behind walls, that device labels remain readable and that the legend explains every special notation. If a crowded kitchen needs a separate view, use clear layers or a supplementary annotated drawing instead of making all text smaller.
Read the plan without using the editor: can you identify the project, floor, room names, scope and revision? Can you follow each special appliance into the equipment list and panel proposal? Give the recipient an explicit list of remaining decisions rather than relying on them to discover assumptions buried in an older export.
Quick method with Planelico
- 1
Import the floor plan PDF
One page per floor.
- 2
Draw the rooms
Type and square footage for each.
- 3
Place receptacles and lighting
Comfort first, then the required ones.
- 4
Add appliances
Including 240 V loads and the EV charger.
- 5
Generate the load center
Circuits, breakers, protection.
- 6
Export and share
Plan and panel design pack as PDF.
Frequently asked questions
Official sources
Build your electrical plan online
Import your PDF plan, drop the electrical symbols and export a clean document to share.