Switchboard layout: RCDs, RCBOs and the circuit schedule
The switchboard is where a floor plan full of power points turns into a finite list of circuits. Getting the board right — enough ways, RCDs arranged as the Wiring Rules require, a schedule that says what each device does — is what makes an installation maintainable ten years later.
What a switchboard diagram is
A switchboard diagram shows what sits inside the board and what each device feeds. It is a different drawing from the floor plan: the plan says where things are, the board diagram says how they are supplied and protected. A complete set of documents for a home usually has both, plus the circuit schedule that ties them together.
What is inside the board
Main switch
Isolates the whole installation and must be clearly and durably marked so anyone can operate it in an emergency (clause 2.3.3).
RCDs
Each 30 mA RCD protects a group of no more than three circuits in a home (clause 2.6.2.4). A full RCBO board replaces them with one combined device per circuit.
Circuit breakers
One per final subcircuit, rated for its cable and load: typically 20 A for power, 10 A for lighting.
Neutral and earth bars, MEN link
Where conductors terminate. The MEN connection between neutral and earth sits at the main switchboard, in an accessible position.
Labels and schedule
Each device identified against the circuit it protects, and the date of first energisation recorded at the board.
Spare ways
Empty positions left for later — solar, a battery, an EV charger. Worth planning deliberately rather than discovering you have none.
RCDs: three circuits each, at least two
In New Zealand, final subcircuits supplying power points, lighting points and directly connected hand-held equipment in a home need 30 mA RCD protection, installed at the switchboard where the circuit starts (clause 2.6.3.3.1). RCDs must switch both active and neutral and be Type A or better (clause 2.6.2.2.3); an EV charging circuit gets its own Type B RCD (clause 7.9.3).
Clause 2.6.2.4 then decides the layout: no more than three final subcircuits on any one RCD in a home, at least two RCDs as soon as there is more than one circuit, and lighting circuits shared between RCDs. The aim is simple: one trip should never leave the whole house without power or light.
Several RCDs or full RCBO
This is the main decision, and it has real consequences for how the house behaves when something goes wrong.
How many ways do you need?
Count the final subcircuits your layout actually requires, then add what the board itself consumes and a genuine allowance for the future. A three-bedroom house typically needs two or more lighting circuits, power circuits by area, a kitchen circuit, the cooktop, the oven, the water heater and air conditioning — before anyone mentions an EV charger, solar or a battery. With three circuits per RCD at most, that is four or five RCDs, or one RCBO per circuit.
Spare ways are cheap at installation and expensive afterwards. Adding a circuit to a full board often means a new board — and replacing all its protection brings every circuit up to current RCD requirements.
The circuit schedule
The schedule is the list of devices and what each one does. At design stage it records your intent; on completion the electrician confirms it with the installed devices and test results, and keeps it at the board.
A design-stage schedule for the house described above might look like this:
Generating the board from your floor plan
Working the circuit list out by hand from a plan is tedious and easy to get wrong. Planelico derives it: once the fittings are placed and the rooms are qualified, it proposes the circuit split, the RCD distribution and a modular board layout with spare capacity.
- 1
Place the fittings on the plan
Power points, lighting points, switches, appliance supplies — everything that will eventually hang off a way in the board.
- 2
Qualify each room
Telling Planelico that a room is a kitchen, a bathroom or a bedroom is what lets it reason about dedicated circuits and constraints.
- 3
Let Planelico group the circuits
It groups nearby fittings into final subcircuits, keeps appliances that need their own supply separate, and places at most three circuits behind each 30 mA RCD, with lighting shared between them.
- 4
Review and adjust
Rename circuits, move a fitting to another circuit, force a dedicated circuit. The generated split is a starting point, not a verdict.
- 5
Export the board layout and schedule
A modular row layout with spare capacity, plus the circuit schedule, exported alongside the annotated plan in one PDF.
See also the AS/NZS 3000 electrical plan guide, the guide to generating a switchboard from a floor plan, and the single-line diagram guide.
Frequently asked questions